Reuse Water Project

Preliminary Engineering Report for Reuse Water Project

New Braunfels Utilities in cooperation with the City of New Braunfels retained River City Engineering, PLLC, to prepare a Preliminary Engineering Report (PER) for the development of a reuse water system for irrigation of the City’s park land, greenbelts, public irrigated landscapes, and athletic fields. The PER was completed in March 2015.

Download the Preliminary Engineering Report (PDF 38.4 MB) 

Parks Reclaimed Water Irrigation Feasibility Study

The City of New Braunfels Parks Reclaimed Water Irrigation Feasibility Study was completed in July 2011 by Espey Consultants, Inc. Study Participants included theCity of New Braunfels, New Braunfels Utilities (NBU), Guadalupe-Blanco River Authority (GBRA), Edwards Aquifer Authority (EAA) and the Texas Water Development Board. The feasibility study was designed to give an analysis of the viability of the idea to use reuse water for parkland irrigation. 

Download the Reclaimed Water Irrigation Feasibility Study (PDF 14.75 MB)