Blog module icon

Displaying all posts tagged with:

'Public Safety'

Jan 10

Fire Station #2

Posted to Capital Programs - Public Safety on January 10, 2020 at 2:36 PM by Brenadette Faust

Fire Station No. 2 Rendering

Fire Station #2 will be located on Water Lane and will replace the current Fire Station #2 facility located on Loop 337. The new 15,000 sf station will be considered a heavy house with 4 apparatus bays and will sleep up to 13. It will also include secure parking, common space, gym / workout space, a commercial grade kitchen, EMS storage, bunker gear storage and a day room. The project is currently undergoing final design and is expected to accept construction bids this Spring prior to beginning construction in the Summer/Fall of 2020. 




Mar 06

Police Department Facility & Veterans Memorial

Posted to Capital Programs - Public Safety on March 6, 2020 at 2:49 PM by Brenadette Faust

image of Police Department exterior design

Included in Proposition 3 of the 2019 Bond the City will build a new Police Station to replace the existing facility. The new facility will be located on San Antonio Street and will include office space for all divisions, public space, training facilities, vehicle maintenance bays, evidence storage and gym. The new facility will also feature a Veterans Memorial enhancing the exterior grounds.
Jan 17

Fire Station #3

Posted to Capital Programs - Public Safety on January 17, 2020 at 2:55 PM by Brenadette Faust

Fire Station No. 3

This project is currently under design as part of the 2019 Bond Program. It will involve construction of a new approximately 12,000 SF fire station on the existing city owned property on Hanz Drive replacing the existing Fire Station 3 at that location. The station will sleep up to 6 and have 3 apparatus bays. It will also include secure parking, common space, gym / workout space, a commercial grade kitchen, EMS storage, bunker gear storage and a day room. The project is currently undergoing final design  and is expected to solicit construction bids this Spring. Construction is anticipated to begin in the Summer/Fall of 2020.